SYLVAN BRIDGE

Hanna Surveying and Engineering was contracted by the City of Dallas to provide two (2) full-time construction inspectors to monitor and report on two (2) City of Dallas bridges being constructed over DART railway. HSE also provided the as-built surveying and QC surveying as required by the City of Dallas. This project started construction in 2022 with construction being completed in 2026.